Ministry of Works and Housing, State of Bahrain awarded to Maceen Al-Sharq Co. to supply and install Pneumatic Tube System for King Hamad General Hospital which consist of three lines in three interlink buildings.
The hospital comprises of 312 beds with 227,000m2 site consisting of 4 floors and 3 main blocks.
The system comprises of 3 zones subdivided into Pharmacy, Laboratory, and Administration while consisting a of total 34 stations with 110mm size of tubings.
On April 2010, the system was ready for testing & commissioning. Due to vast experience in previous projects H&B staff alone successfully conducted the testing & commissioning of the system.